Transportation Sector

Home > Projects > Transportation Sector
OUR PROJECTS
With our tradition of service excellence, high quality of work and zero loss-time accidents,Concordsuccessfully achieves customer satisfaction leading to repeat orders from our regular customers. Customer commendations as well as referrals have steadily increased our clientele in the region over the last 25 years.
CATEGORY
COUNTRY

- Transportations

Singapore

• Kallang-Paya Lebar Expressway C410 to C414

Description: Tunnelling Electrical Distribution and Lighting System Electrical installation for KPE Expressway consisting of 8.75km underground expressway.

Completed in 2012.

• Canberra Station Signalling – In Progress

Description: Installation of signalling related equipment

Malaysia

• KVMRT Line 1

Description: Installation of Electrical, equipment, assist SAT & PAT and assist testing & commissioning. Project duration (April 2015 - August 2016).

Completed in 2016.

• Kuala Lumpur International Airport Track Transit System

Description: Installation, testing and commissioning of Power Rail, Power Distribution System and Automatic Train Control System for Sepang (KLIA) PTC-III. The KLIA Track Transit System consist of 2 stations, running over 1.2 km.

Completed in 1998.

DUBAI, UAE

• Dubai Airport Automatic People Mover System

Description: Power Distribution System, Signalling, Communication & Platform Screen Door.

Completed in 2011.

• Dubai Metro Route 2020 Expansion Work – In Progress

Description: Installation of Power Distribution System Tie-in Work

- Power & Infrastructures

Singapore

• Tuas Undersea Tunnel Project

Description: Complete electrical and instrumentation system including earthing system, lightning protection system, power cable circuit cooling system and tunnel ventilation system for Tuas Terminal Station, Pioneer Terminal Station and cable tunnels.

Completed in 2006

• Tuas Incineration Plant

Description: Electrical & Instrumentation Works at Tuas Incineration Plant.

Completed in 2005

• Pulau Seraya Power Station Stage 1, 2 and 3

Description: Erection of HT & LT Switchgear, Transformer, Control Panel, Batteries, UPS, laying of 66kV HT cable complete with Termination, laying of 300km HT, LT & Control cables, 15km cable ladder and related work.

Completed in 2001

• PUB – Senoko Power Station Gas Turbine Unit 1, 2, 3 & 4, Singapore

Description: Supply, Installation, Testing & Commissioning of Electrical & Instrumentation Works for Filter House.

Completed in 2000

• Kampong Java 230kV Gas-insulated Switchgears Sub-station, Singapore

Description: Installation of 230kV gas-insulated switchgears, 22 kV and 38kV ter-switchgears, shunt reactors, earthing resistors and transformer, relay and control panels, high voltage and low voltage cables, cable supporting system and termination of high voltage and low voltage cables.

Completed in 1998

• Labrador and Ayer Rajah 400kV Sub-station

Description: Electrical Installation of 400kV and 230kV Switchgear, Ancillary Equipment and Accessories for Labrador and Ayer Rajah Sub-station.

Completed in 1996

Malaysia

• Tanjung Bin 3 x 700MW Coal Fire Power Plant, Malaysia

Description: Installation of Equipment, Cable Support, MV, LV & Instrument Cable & Tubing for 3 Boilers.

Completed in 2006

• Jimah Power Plant at Port Dickson, Malaysia

Description: Installation and Testing of Electrical and Instrumentation work for Jimah Power Plant at Port Dickson.

Completed in 2006

• Panglima 710MW Combined Cycle Gas Turbine Power Plant at Melaka

Description: Construction, erection & commissioning of combined cycle power plant. Consists of 2 gas turbine and 1 steam turbine.

Completed in 2002

• Vale Onshore & Offshore

Description: Electrical And Instrumentation erection for Onshore and Offshore. Project duration (Apr 2013 - July 2014)

Completed in 2014

- Pharmaceutical Sector

Singapore

• Balzac Project @ Aventis Pharma

Description: Electrical Works For Non Process & Utilities Facilities

Completed in 2009

• Genentech ECP1 Singapore

Description: Electrical & Instrumentation Works

Completed in 2009

- Wafer Sector

Singapore

• Ulu Pandan NEWater Design,Build, Own & Operate (DBOO0 Project—Electrical, I & C Package)

Description: Lighting Fittings, SSO, Isolators, Cable Support, LV Cables, Termination Work, Pipe Works, Lighting & Earthling, etc.

Completed in 2007.

 

• High Grade Water Reclamation Plant at MK13 Lot99486T at Kranji (Contract 5)

Description: Complete Electrical works, telephone system, data system & CCTV System

Completed in 2009

• Chartered (Fab2, 3, SMP &7)

Description: Design, supply & installation of Tap-off Units, DBs, Transformer & Cabling for Hookup of Wafer Fab Tools.

Completed in 2009.

• Toa Payoh EWS Clean Room Package No. TPY A05

Description: Electrical & Instrumentation Works

Completed in 2007

• Upgrading of Main Intake Supply from 22kV to 66kV for STMicroelectronics Plants

Description: Design, supply and installation of Electrical Services for Fit-up consisting of HT Cabling, Busbar System, PNL Panels & Main Switchboard, Tap-off units, DBs, Transformer & Cabling for Hookup of WaferFab Tools.

Completed in 2010

Malaysia

• MEMC Solar Wafer Plant

Description: Engineering, Procurement and Construction of Electrical Services for Fit-up consisting of Transformers, Generators, HT Cabling, Busbar System, Electrical Main and Sub Panels, Main Switchboard, Tap-off units, & Cabling for Hookup of WaferFab Tools.

Completed in 2011

- Data Centre

Singapore

• PUB – Telin Data Centre

Description: Electrical & Instrumentation Works at Telin Data Centre.

Completed in 2017

- Offshore & Marine

Singapore

• Bohai Phase II Development Project

Description: Electrical and instrumentation works for Floating Production, Storage & Offloading Vessel (FPSO).

Singapore

• C753 North East Line MRT System

Description: Power Distribution System & Power Control Cabling with 1 Depot, 16 Stations, 18km track length (Double Track) Completed in 2006

• C775 North East Line MRT System

Description: Installation, Testing and Pre-commissioning for the whole NEL 16km MRT System. Installation, Testing and Commissioning of Electrical Services for NEL Sector-1. Completed in 2006

• Circle Line Stage I, II, IV, V & Kim Chuan Depot

Description: The Circle Line project with a total length of 33.3km, with 29 stations and interchange with East-West, North-East and North-South lines.

Circle Line Main Depot Stage 1, 2, 4 and 5 for the installation of stations and tunnels that consists of 22kV GIS Equipment, traction equipment and cabling works.

Completed in 2010.

• C801 Bukit Panjang LRT System

Description: Installation, Testing & Commissioning of the Power Rail, Power Distribution System & Automatic Train Control System for Bukit Panjang LRT – 14.5km, 1 Depot and 15 Stations.

Completed in 2000.

• C810 Punggol LRT

Description: Installation of Power Distribution System and signaling cabling works. Punggol LRT comprises of 15 stations in two loops, covering 10.3km.

Completed in 2006

• Singapore Changi Airport, Automated People Mover System (PMS)

Description: Design, supply, installation, testing and commissioning of Power Distribution System. Installation includes Transformer, Traction Equipment, Signal and Communication Equipment, High Tension and Low Tension.

It comprises of 10 trains, 7 stations and 6.5km of elevated tracks – a new PMS which provides seamless inter-terminal transportation.

Completed in 2006.

• MRT NS EW Line Re-signalling - In Progress

Description: East West and North South Lines re signaling. Installation of cable support system and signalling equipment. Cable laying in station platforms and depots. Fault finding, Post Installation Check Out (PICO) Test and assist in Testing & Commissioning. De commissioning of old equipment. 14 zones, 60 stations and 3 depots for total 100 KM

DUBAI, UAE

• Dubai Metro Red & Green Line

Description: Concord participated in both the Power Distribution System and Signaling System installation. Electrical cabling work for Dubai Metro Project-station depot, AFC,PSD, Trackside 33 kv , Trackside PDS.

The Red Line consists of 52km, 29 stations and 2 Depots and the Green Line with 18 stations and 1 Depot over 23km.

Completed in 2009/2011 respectively.

Kingdom of Saudi Arabia

• Makkah – Al Mashaaer Al Mugaddassah Metro Project

Description: Overhead Power Catenary System Installation and Signalling, Communication, PA and CCTV System.

Completed in 2010.

QATAR

• Lusail LRT – In Progress

Description: Installation of communication system for Lusail LRT network. The network will consist of 4 main tram lines that span 33.1km and 37 passenger train stations, including 26 at ground level, ten underground and 1 elevated interchange station.

• Doha Metro Power Distribution System – In Progress

Description: Supply and installation of Power Distribution System (3 lines, 75km, 37 stations).

• Doha Metro (Signal) – In Progress

Description: Installation of signalling and communications system.

Macau

• Macau LRT Phase 1 – In Progress

Description: Supply and installation of HVAC and Electrical Services. Macau LRT: 9.3km, 11 stations.